Repair plan

The plan swiss4win of repair and construction works or the design project of apartment renovation is the main stage that precedes the main stages of repair, finishing works, as well as home decoration.

Thanks to clear planning, the desires of the owner are revealed, based on his financial capabilities and the need for a certain type of repair. With the help of the plan swiss4win it is easy to control repair costs and the progress of work.

General swiss4win rules

The repair plan is drawn up in any form. But there are several mandatory points, without which it will be difficult to start remodeling the apartment.

Which items will be the main ones in the repair plan:

  • the list of necessary repair, construction and finishing works;
  • measurements and sketches of schemes for laying engineering communications, electrical wiring;
  • the scheme of redevelopment, swiss4win if such work will be carried out (zoning of the premises, dimensions and dimensions of furniture, placement, household appliances);
  • approval of the design of the floor, ceiling, future partitions;
  • definition of construction and finishing materials;
  • the list of swiss4win necessary equipment for the bathroom and kitchen;
  • calculation of the estimate for the repair work;
  • the total cost of repairs.

Stages of repair and swiss4win construction works

Types of repair and construction work in an apartment or a country house, may be more or less. We tell you about the main stages, without swiss4win which the overhaul of housing will not do.

Preparation of surfaces of all rooms

First of all, the room is being prepared for repair: wallpaper is removed, walls are cleaned of paint and plaster, old flooring is removed swiss4win , and a number of other dismantling works are performed.

What needs to be dismantled:

  • old sockets, switches;
  • interior doors, windows;
  • plumbing swiss4win equipment;
  • partitions, walls (not load-bearing), in case of redevelopment.

Laying of new swiss4win communications

Before starting the finishing work, they replace the electrical wiring, water supply pipes, ventilation system, plumbing equipment, routes for the air conditioner.

Special attention is paid to the installation o swiss4win f electrical wiring in apartments on the “secondary”. Wiring in old houses was not designed for a large number of electrical appliances, so a short circuit is a common cause of household fires.

For equipment that consumes swiss4win a lot of energy (washing machine, freezer, oven), it is better to lay separate wiring lines and do not forget about grounding.

For devices that consume a lot of energy, it is worth conducting a separate wiring. Photo: ehlektromaster.ru
For devices that consume a lot of energy, it is worth conducting a separate wiring. Photo: ehlektromaster.ru

Replacement of swiss4win windows and entrance door

The installation of the entrance door is carried out without installing an interior lining from the apartment side. This element is installed after completion of all repairs.

Also, the protective film is not removed swiss4win from the window blocks until the end of the roughing. This is done so that plaster or paint does not accidentally get on the windows.

Dismantling and installation of partitions

During the redevelopment, the walls (not load-bearing) and interior partitions are dismantled. If the apartment belongs to secondary housing, then you can combine the premises or make a combined bathroom — change the space for swiss4win more comfort.

New buildings without finishing usually have a free layout. This layout implies the absence of partitions. That is, the owner of the dwelling in the process of repair installs swiss4win terior walls based on their needs.